The Reject Shop Distribution Centre Completed

After 3 months of operations, The Reject Shop officially opened the WA Distribution Centre in September with the The Reject Shop Board Members and Directors attending.

The red ribbon was cut by a local member of Parliament. The building was delivered with high quality finishes and exceptional landscaping.

The Distribution Centre is currently at 50% capacity and with the addition of a further 50 stores into WA this space will fill quickly.

 

RejectShop_Front-Entrance
Front Entrance

RejectShop_Distribution-Centre-A RejectShop_Distribution-Centre-B RejectShop_Distribution-Centre-C

Distribution Centre
RejectShop_Change-Rooms
Change Rooms
RejectShop_Loading-Dock-Doors
Loading Dock Doors
Project Name: The Reject Shop DC
Client: The Reject Shop
Cost: $12M
Location: Hazelmere, WA
Status: Complete