Melbourne Central ELLA (Part 2)

After a long gestation period of about four years and numerous proposals, the design for ELLA Part 2 (former Comm Bank, then Hub site) was finally agreed based on a design by Therefore Studio in conjunction with i2C. Construction starting in early 2019.

This new food and culture precinct makes for a space to sit and relax whilst listing to music, catching up with friends and colleagues, working on your laptop or just generally taking in the ambience.  It links LaTrobe Street with the newly opened ELLA laneways, taking pressure off the overly congested entry to the railway station.

Read more

Geebung Service Centre

Freedom Fuel’s and Taste My Bean drive thru coffee offering located prominently in a busy, heavily industrial area of Brisbane.

i2C incorporated the recently redesigned Freedom sales and food layout into the development along with a drive thru coffee outlet.

Read more

On site at Eastern Creek Quarter

Construction of the first stage of Eastern Creek Quarter is well underway with key aspects of the site staring to take shape.

Precast concrete panels for the centre exterior walls can be seen propped and supported, ready for final structural fastening and connection to steel structure. Air handling units and other mechanical equipment have been delivered to site, for ceiling plenum installation.

Read more

Calleya Town Centre Stage 1

Stage 1 of the Calleya Town Centre has been designed as a mixed-use community hub in the heart of Stockland’s residential community, Calleya, located in Treeby WA. The initial stage includes a child care centre to accommodate 90+ children, a combined café and food offering tenancy, in addition to Stockland’s sales office for the surrounding developments.

Read more